TRANSPORTA Technology s.r.o. participated in the implementation of the project "Reduction of fugitive emissions of homogenization landfill North" for an important investor ArcelorMittal Ostrava a.s.

The subject of performance was the delivery of selected parts of technological equipment including steel structures, modifications of equipment and constructions for transport of required materials from the agglomeration North to the agglomeration South. All equipment required for connection to the existing transport routes on the agglomeration South and agglomeration North and its operation was included in the delivery.

The extensive delivery included roughly 320 t of steel structures and 200 t of technology. Belt conveyors for conveying a homogenizing mixture, namely two belt conveyors with a length of 594 m and 440 m, both 1200 mm wide and one reverse conveyor were included. The iron agglomerate is one of the main batch components to blast furnaces.

The project has been prepared and implemented in a very short time. Since the signing of the contract with the contractor of the entire project in November 2017, the project documentation and the implementation documentation were elaborated and the production and delivery of conveyors and steel structures and the project  was completed in July 2018.

This is an exceptionally technologically demanding transport system. Due to the heavy construction of the transport routes and their difficult location in the existing facilities, more than half of the transport lines were led by air on bridges with rail transport, including junctions. For bridging the rail junction, a bridge with an inserted field with a span of over 39 m was used.

Due to the necessity to maintain the full traffic capacity of the road under the conveyor track and the existing technology it was necessary to use the portal posts and to build the construction over the existing transport route.

The transport route was completed by a complex steel structure of the spill station, where the problem of bridging the existing transport route with the transfer of materials to 3 continuous conveyors was solved.

less...
TRANSPORTA Technology s.r.o. participated in the modernization of internal fuel transportation, which included 2 coal transport and biomass transport lines.

In August 2017 the reconstruction of the internal fuel transportation for the K11 boiler began in Mondi Štětí a.s.
TRANSPORTA Technology s.r.o. participated in the modernization of internal fuel transportation, which included 2 coal transport and biomass transport lines.

The reconstruction of the transport lines included chain conveyors, turnstiles, shutters and sealing air system. The reconstruction was completed in 2017 and the verification of guaranteed parameters was carried out. Currently, there is a test run on the transport lines.


 

less...
TRANSPORTA Technology s.r.o. participates in the implementation of the project "Waterwork Klabava - Improving the Retention and Ensuring of the Water Works Against Effects of Large Waters".

The contract is focused on the production and assembly of  sealing segments of Waterwork, and the supply includes documentation processing, production and assembly of the segments. Production and delivery of sealing segments and their control was completed in August 2018. Assembly works are currently underway and scheduled to be completed by the end of April 2019.

less...
Reconstruction of belt conveyor with belt width of 1800 mm, and delivery of a tripper car SVK for belt width of 1800 mm.
Project title:
Supply of mining technology TC 2/1: construction project no. K 55

Customer:
VÍTKOVICE POWER ENGINEERING a.s.

Description:
Reconstruction of belt conveyor with belt width of 1800 mm, and delivery of a tripper car SVK for belt width of 1800 mm.

Executed according to the original TRANSPORTA design documentation.

 

less...
Delivery of new equipment, refurbishment of selected existing equipment, complex renewal of electrical drives and all engineering and design work.
Project title:
Complex Renewal of Prunéřov Power Plant II - OB92 – VEP Management

Customer:
VÍTKOVICE POWER ENGINEERING a.s.

Description:
Reconstruction and capacity increase of the facility in terms of increase in required output parameters of conveyors and their service life extension by another 25 – 30 years. Subject of OB92 – VEP Management was delivery of new equipment, refurbishment of selected existing equipment, complex renewal of electrical drives and all engineering and design work. The scope of technological part of the delivery in scope of this OB was divided into DPS 10.03 Gypsum Transport and Storage, DPS 10.05 Internal VEP Transport, DPS 10.13 Hoisting Equipment, DPS 10.14 Electrical Equipment, DPS 10.15 Automated Control System of Technical Processes (ASŘ TP), DPS 10.16 Technological Steel Structures, DPS 10.17 Paintings, DPS 10.18 Insulation, and DPS 10.19 Dismantling

Executed according to the original TRANSPORTA design documentation.

 

less...
Complete exchange of the existing worn-out through belt conveyor PD 11, width of 1600 mm, laid on a detached bridge width of 4000 mm, for a new tube belt conveyor TPD 11 500mm in diameter.
Project title:
Complex Renewal of Prunéřov Power Plant II - OB92.1 Internal VEP Transport – Belt Conveyor PD 11

Customer:

ŠKODA PRAHA Invest s.r.o.

Description:

In scope of this project we executed complete exchange of the existing worn-out through belt conveyor PD 11, width of 1600 mm, laid on a detached bridge width of 4000 mm, for a new  tube belt conveyor TPD 11 500mm in diameter. The exchange of the whole bridge above the CEZ a.s. railway and transit railway corridor   Chomutov – Karlovy Vary was executed during the railway operation. For dismantling and exchange of components a crane, the only of its kind in the Czech Republic, was used.

Executed according to the original TRANSPORTA design documentation.

 

less...

Reconstruction of transport tracks, crushers and mills, including delivery of new hydro-cyclone stations for slurry preparation for the desulphurisation unit; a set of adjustments for production dustiness combat.

Project title:
Complex Renewal of Tušimice Power Plant II - OB91 and 92

Customer:
ŠKODA PRAHA Invest s.r.o.

Description:
Reconstruction of transport tracks, crushers and mills, including delivery of new hydro-cyclone stations for slurry preparation for the desulphurisation unit; a set of adjustments for production dustiness combat.

Executed according to the original TRANSPORTA design documentation.

 

less...

Installation of drives and gear boxes to drive frames, a frame and support of the belt drive, delivery and assembly for installation of SVENBORG braking system, adjustment of driving pulleys, steel structures of driving stations, belt tensioning - sensing, delivery and installation of scrapers, dust belt of the belt conveyor, reversing station, central part of the bet conveyor, mechanical part of end switches and sensors, exchange of 50% of grids and stair carriages for galvanized ones, new safety signs.

Project title:
Renewal of Belt Conveyors PD 263 and PD 264

Customer:
PRODECO, a.s.

Description:
Installation of drives and gear boxes to drive frames, a frame and support of the belt drive, delivery and assembly for installation of SVENBORG braking system, adjustment of driving pulleys, steel structures of driving stations, belt tensioning - sensing, delivery and installation of scrapers, dust belt of the belt conveyor, reversing station, central part of the bet conveyor, mechanical part of end switches and sensors, exchange of 50% of grids and stair carriages for galvanized ones, new safety signs.

Executed according to TRANSPORTA design documentation: PS 8501.1, PS 8506.4, PS 8507.4, PS 8505.3 – Renewal of mechanical and electrical part of belt conveyor PD 263, PS 8502.1, PS 8508.4, PS 8509.4, PS 8503.3 – Renewal of mechanical and electrical part of belt conveyor PD 264

 